June 2026 - African Union Headquarters, Addis Ababa, Ethiopia
- Consultation and validation discussions were held for AfSEM and CMP under CEPA implementation.
September 2024 - African Union Headquarters, Addis Ababa, Ethiopia
- Consultations were held for the AfEES, AfSEM and CMP bridging phase.
February 2024 - Best Western Pearl, Addis Ababa, Ethiopia
- The AU Heads of State Summit endorsed CMP and AfSEM as African Union Agenda 2063 flagship projects.
- Consultations covered the CMP bridging phase and validation of the Transmission Network Scenarios and Multiple Energy Project Prioritisation reports.
September 2023 - Golden Tulip, Zanzibar, Tanzania
- Final CMP Phase II consultations validated deliverables on Cost-Benefit Analysis, Network Studies, Synthesis of Results, CMP Models Documentation and Digital Visualisation.
- At the fourth ordinary session of the STC-TTIIE, African Union energy ministers endorsed CMP and AfSEM.
July 2023 - Golden Tulip, Cotonou, Benin
- CMP Phase II consultations validated regional and continental planning scenarios and sensitivity-analysis results.
March 2023 - Hotel des Mille Collines, Kigali, Rwanda
- The fourth SPLAT-MESSAGE training was facilitated by IRENA and IAEA for AUDA-NEPAD, EU-GTAF and the power pools.
- CMP Phase II consultations validated the Demand Forecast and Scenario Analysis and the 2020-2040 baseline and reference planning scenarios.
November 2022 - IRENA Offices, Bonn, Germany
- The third SPLAT-MESSAGE training was facilitated by IRENA and IAEA for AUDA-NEPAD, EU-GTAF and the power pools.
August 2022 - Golden Tulip Hotel, Cairo, Egypt
- The second SPLAT-MESSAGE training was facilitated by IRENA and IAEA for AUDA-NEPAD, EU-GTAF and the power pools.
June 2022 - Golden Tulip Hotel, Addis Ababa, Ethiopia
- The first SPLAT-MESSAGE training was facilitated by IRENA and IAEA for AUDA-NEPAD, EU-GTAF and the power pools.
- CMP Phase II consultations validated reports on demand forecasting, resource assessment, the CMP platform and database, and the platform user guide.
March 2022 - SAPP Headquarters, Harare, Zimbabwe
- CMP Phase II consultations reviewed reports on demand forecasting and scenario analysis, resource assessment, and the CMP platform and database.
November 2021 - Balalaika Hotel, Johannesburg, South Africa
- CMP Phase II consultations reviewed and validated the Demand Forecast and Scenario Analysis report.